{"id":5346,"date":"2022-06-06T11:33:20","date_gmt":"2022-06-06T04:33:20","guid":{"rendered":"https:\/\/localhost\/hki_2024\/?p=5346"},"modified":"2024-12-04T08:05:11","modified_gmt":"2024-12-04T01:05:11","slug":"implementasi-bim-hki-sambungkan-tol-pekanbaru-bangkinang","status":"publish","type":"post","link":"https:\/\/hkinfrastruktur.com\/en\/implementasi-bim-hki-sambungkan-tol-pekanbaru-bangkinang\/","title":{"rendered":"BIM Implementation, HKI Connects Pekanbaru \u2013 Bangkinang Toll Road"},"content":{"rendered":"<p><b><span data-contrast=\"auto\">Pekanbaru<\/span><\/b><span data-contrast=\"auto\"> \u2013 PT Hutama Karya Infrastruktur (HKI) has completed part of the Pekanbaru-Bangkinang Toll Road, one of the sections in the Trans Sumatra Toll Road (JTTS) Pekanbaru-Padang segment. HKI has successfully finished 31 km of the total 40 km of the toll road.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:48,&quot;335559740&quot;:276,&quot;335559746&quot;:20}\">\u00a0<\/span><\/p>\n<p class=\"translation-block\">In the construction of the Pekanbaru-Bangkinang Toll Road, HKI implemented Building Information Modeling (BIM) as per the directive issued by the Toll Road Regulatory Agency, aligning with the Ministry of Public Works and Public Housing's support for digital construction in Indonesia to accelerate infrastructure development. This initiative is supported by the government through regulations, human resource development, innovative funding, and the application of research results and technology, in this case, BIM implementation.<\/p>\n<p class=\"translation-block\">Building Information Modeling (BIM) is a digital, three-dimensional representation of the actual building plan, which can be viewed using Virtual Reality (VR). The 3D model contains all the information needed by stakeholders to make decisions at every stage of construction.<\/p>\n<p class=\"translation-block\">The implementation of BIM on the Pekanbaru-Bangkinang Toll Road project has been applied in planning the main road, structures (overpasses, underpasses, bridges, box traffic, box drains), simulation scheduling, and cost estimating. In the field, some tasks have already used work drawings as outputs from BIM, unlike before, which relied on manual drawings.<\/p>\n<p class=\"translation-block\">With BIM and the Common Data Environment (CDE) platform, the document approval process can now be done anytime and anywhere. BIM is also used to compare plans with actual field work in terms of work volume, costs, and scheduling.<\/p>\n<p class=\"translation-block\">With the implementation of BIM, the construction process can become more efficient. Tasks that would typically require multiple personnel over a set period can now be completed in a shorter timeframe using the BIM system. For example, the process of creating structural shop drawings for bridges, calculating concrete and reinforcement volumes, determining work stages, and computing overall quantities can all be streamlined. Using BIM, a highway project covering a 5 km section\u2014handled by a single person\u2014can be completed within 15 days, from drafting the drawings to calculating the volumes. Meanwhile, bridge structure works can be completed in approximately 10 days. \"One of the other key benefits lies in the significantly more precise and accurate volume calculations, as the system can interpret structural forms in detail based on the planned model. As a result, BIM implementation in toll road construction helps reduce both project duration and overall costs,\" said Selo Tjahjono, Director of Operations III.<\/p>\n<p><span data-contrast=\"auto\">The use of BIM in the Pekanbaru-Bangkinang Toll Road project has earned recognition from the Ministry of Public Works and Housing during the 2021 National Road Day celebration. HKI won second place in the Road and Bridge Technology Innovation Competition through a video presentation. In the 4-minute 30-second video, the Pekanbaru-Bangkinang Project Team explained how BIM assists the field team in planning and constructing the toll road.\u00a0<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:48,&quot;335559740&quot;:276,&quot;335559746&quot;:20}\">\u00a0<\/span><\/p>\n<p class=\"translation-block\">BIM implementation at HKI is part of the company's commitment to digitizing business processes. In addition to BIM, HKI has also implemented SAP-based Enterprise Resource Planning (ERP) for digital transaction processes. HKI\u2019s digital business process is an active step towards becoming a leading integrated construction company in Indonesia.<\/p>\n<p><img decoding=\"async\" class=\"alignnone size-full wp-image-6727\" src=\"https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2022\/06\/Sta-8-sd-6.jpg\" alt=\"\" width=\"1600\" height=\"900\" srcset=\"https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2022\/06\/Sta-8-sd-6-200x113.jpg 200w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2022\/06\/Sta-8-sd-6-300x169.jpg 300w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2022\/06\/Sta-8-sd-6-400x225.jpg 400w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2022\/06\/Sta-8-sd-6-600x338.jpg 600w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2022\/06\/Sta-8-sd-6-768x432.jpg 768w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2022\/06\/Sta-8-sd-6-800x450.jpg 800w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2022\/06\/Sta-8-sd-6-1024x576.jpg 1024w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2022\/06\/Sta-8-sd-6-1200x675.jpg 1200w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2022\/06\/Sta-8-sd-6-1536x864.jpg 1536w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2022\/06\/Sta-8-sd-6.jpg 1600w\" sizes=\"(max-width: 1600px) 100vw, 1600px\" \/><\/p>","protected":false},"excerpt":{"rendered":"<p>Pekanbaru \u2013 PT Hutama Karya Infrastruktur (HKI) has completed part of the Pekanbaru-Bangkinang Toll Road, one of the sections in the Trans Sumatra Toll Road (JTTS) Pekanbaru-Padang segment. HKI has successfully finished 31 km of the total 40 km of the toll road.\u00a0<\/p>","protected":false},"author":1,"featured_media":6726,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"iawp_total_views":30,"footnotes":""},"categories":[7,8],"tags":[],"class_list":["post-5346","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-berita-perusahaan","category-siaran-pers"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Implementasi BIM, HKI Sambungkan Tol Pekanbaru - Bangkinang - PT Hutama Karya Infrastruktur (HKI)<\/title>\n<meta name=\"description\" content=\"Pekanbaru \u2013 PT Hutama Karya Infrastruktur (HKI) saat ini telah menyelesaikan sebagian Jalan Tol Pekanbaru-Bangkinang, yang merupakan salah satu seksi dalam rangkaian Jalan Tol Trans Sumatera (JTTS) Ruas Pekanbaru-Padang. Adapun panjang Jalan Tol Pekanbaru-Bangkinang yang telah diselesaikan HKI yakni 31 km dari total panjang 40 km.\u00a0\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/hkinfrastruktur.com\/en\/implementasi-bim-hki-sambungkan-tol-pekanbaru-bangkinang\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Implementasi BIM, HKI Sambungkan Tol Pekanbaru - Bangkinang - PT Hutama Karya Infrastruktur (HKI)\" \/>\n<meta property=\"og:description\" content=\"Pekanbaru \u2013 PT Hutama Karya Infrastruktur (HKI) saat ini telah menyelesaikan sebagian Jalan Tol Pekanbaru-Bangkinang, yang merupakan salah satu seksi dalam rangkaian Jalan Tol Trans Sumatera (JTTS) Ruas Pekanbaru-Padang. Adapun panjang Jalan Tol Pekanbaru-Bangkinang yang telah diselesaikan HKI yakni 31 km dari total panjang 40 km.\u00a0\" \/>\n<meta property=\"og:url\" content=\"https:\/\/hkinfrastruktur.com\/en\/implementasi-bim-hki-sambungkan-tol-pekanbaru-bangkinang\/\" \/>\n<meta property=\"og:site_name\" content=\"PT Hutama Karya Infrastruktur (HKI)\" \/>\n<meta property=\"article:published_time\" content=\"2022-06-06T04:33:20+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-12-04T01:05:11+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2022\/06\/Overpass-Sta-33318.105.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1600\" \/>\n\t<meta property=\"og:image:height\" content=\"1067\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"hkinfrastruktur\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"hkinfrastruktur\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/implementasi-bim-hki-sambungkan-tol-pekanbaru-bangkinang\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/implementasi-bim-hki-sambungkan-tol-pekanbaru-bangkinang\\\/\"},\"author\":{\"name\":\"hkinfrastruktur\",\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/#\\\/schema\\\/person\\\/e0d1e365a4050beb34e1a991f132a46f\"},\"headline\":\"Implementasi BIM, HKI Sambungkan Tol Pekanbaru &#8211; Bangkinang\",\"datePublished\":\"2022-06-06T04:33:20+00:00\",\"dateModified\":\"2024-12-04T01:05:11+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/implementasi-bim-hki-sambungkan-tol-pekanbaru-bangkinang\\\/\"},\"wordCount\":503,\"publisher\":{\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/implementasi-bim-hki-sambungkan-tol-pekanbaru-bangkinang\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/hkinfrastruktur.com\\\/wp-content\\\/uploads\\\/2022\\\/06\\\/Overpass-Sta-33318.105.jpg\",\"articleSection\":[\"Berita Perusahaan\",\"Siaran Pers\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/implementasi-bim-hki-sambungkan-tol-pekanbaru-bangkinang\\\/\",\"url\":\"https:\\\/\\\/hkinfrastruktur.com\\\/implementasi-bim-hki-sambungkan-tol-pekanbaru-bangkinang\\\/\",\"name\":\"Implementasi BIM, HKI Sambungkan Tol Pekanbaru - Bangkinang - PT Hutama Karya Infrastruktur (HKI)\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/implementasi-bim-hki-sambungkan-tol-pekanbaru-bangkinang\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/implementasi-bim-hki-sambungkan-tol-pekanbaru-bangkinang\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/hkinfrastruktur.com\\\/wp-content\\\/uploads\\\/2022\\\/06\\\/Overpass-Sta-33318.105.jpg\",\"datePublished\":\"2022-06-06T04:33:20+00:00\",\"dateModified\":\"2024-12-04T01:05:11+00:00\",\"description\":\"Pekanbaru \u2013 PT Hutama Karya Infrastruktur (HKI) saat ini telah menyelesaikan sebagian Jalan Tol Pekanbaru-Bangkinang, yang merupakan salah satu seksi dalam rangkaian Jalan Tol Trans Sumatera (JTTS) Ruas Pekanbaru-Padang. Adapun panjang Jalan Tol Pekanbaru-Bangkinang yang telah diselesaikan HKI yakni 31 km dari total panjang 40 km.\u00a0\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/implementasi-bim-hki-sambungkan-tol-pekanbaru-bangkinang\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/hkinfrastruktur.com\\\/implementasi-bim-hki-sambungkan-tol-pekanbaru-bangkinang\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/implementasi-bim-hki-sambungkan-tol-pekanbaru-bangkinang\\\/#primaryimage\",\"url\":\"https:\\\/\\\/hkinfrastruktur.com\\\/wp-content\\\/uploads\\\/2022\\\/06\\\/Overpass-Sta-33318.105.jpg\",\"contentUrl\":\"https:\\\/\\\/hkinfrastruktur.com\\\/wp-content\\\/uploads\\\/2022\\\/06\\\/Overpass-Sta-33318.105.jpg\",\"width\":1600,\"height\":1067},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/implementasi-bim-hki-sambungkan-tol-pekanbaru-bangkinang\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/hkinfrastruktur.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Implementasi BIM, HKI Sambungkan Tol Pekanbaru &#8211; Bangkinang\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/#website\",\"url\":\"https:\\\/\\\/hkinfrastruktur.com\\\/\",\"name\":\"PT Hutama Karya Infrastruktur (HKI)\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/hkinfrastruktur.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/#organization\",\"name\":\"PT Hutama Karya Infrastruktur (HKI)\",\"url\":\"https:\\\/\\\/hkinfrastruktur.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/hkinfrastruktur.com\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/logo-hki-02.png\",\"contentUrl\":\"https:\\\/\\\/hkinfrastruktur.com\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/logo-hki-02.png\",\"width\":1200,\"height\":619,\"caption\":\"PT Hutama Karya Infrastruktur (HKI)\"},\"image\":{\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.instagram.com\\\/hkinfrastruktur\\\/\",\"https:\\\/\\\/www.youtube.com\\\/@hkinfrastruktur2682\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/hk-infrastruktur\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/#\\\/schema\\\/person\\\/e0d1e365a4050beb34e1a991f132a46f\",\"name\":\"hkinfrastruktur\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d14410bbaff367aee49a31c9d6ecf9d3f8c689d7a876045e36e65ebaeffcf988?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d14410bbaff367aee49a31c9d6ecf9d3f8c689d7a876045e36e65ebaeffcf988?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d14410bbaff367aee49a31c9d6ecf9d3f8c689d7a876045e36e65ebaeffcf988?s=96&d=mm&r=g\",\"caption\":\"hkinfrastruktur\"},\"sameAs\":[\"https:\\\/\\\/hkinfrastruktur.com\"],\"url\":\"https:\\\/\\\/hkinfrastruktur.com\\\/en\\\/author\\\/hkinfrastruktur\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Implementasi BIM, HKI Sambungkan Tol Pekanbaru - Bangkinang - PT Hutama Karya Infrastruktur (HKI)","description":"Pekanbaru \u2013 PT Hutama Karya Infrastruktur (HKI) has completed part of the Pekanbaru-Bangkinang Toll Road, one of the sections in the Trans Sumatra Toll Road (JTTS) Pekanbaru-Padang segment. HKI has successfully finished 31 km of the total 40 km of the toll road.\u00a0","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/hkinfrastruktur.com\/en\/implementasi-bim-hki-sambungkan-tol-pekanbaru-bangkinang\/","og_locale":"en_US","og_type":"article","og_title":"Implementasi BIM, HKI Sambungkan Tol Pekanbaru - Bangkinang - PT Hutama Karya Infrastruktur (HKI)","og_description":"Pekanbaru \u2013 PT Hutama Karya Infrastruktur (HKI) saat ini telah menyelesaikan sebagian Jalan Tol Pekanbaru-Bangkinang, yang merupakan salah satu seksi dalam rangkaian Jalan Tol Trans Sumatera (JTTS) Ruas Pekanbaru-Padang. Adapun panjang Jalan Tol Pekanbaru-Bangkinang yang telah diselesaikan HKI yakni 31 km dari total panjang 40 km.\u00a0","og_url":"https:\/\/hkinfrastruktur.com\/en\/implementasi-bim-hki-sambungkan-tol-pekanbaru-bangkinang\/","og_site_name":"PT Hutama Karya Infrastruktur (HKI)","article_published_time":"2022-06-06T04:33:20+00:00","article_modified_time":"2024-12-04T01:05:11+00:00","og_image":[{"width":1600,"height":1067,"url":"https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2022\/06\/Overpass-Sta-33318.105.jpg","type":"image\/jpeg"}],"author":"hkinfrastruktur","twitter_card":"summary_large_image","twitter_misc":{"Written by":"hkinfrastruktur","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/hkinfrastruktur.com\/implementasi-bim-hki-sambungkan-tol-pekanbaru-bangkinang\/#article","isPartOf":{"@id":"https:\/\/hkinfrastruktur.com\/implementasi-bim-hki-sambungkan-tol-pekanbaru-bangkinang\/"},"author":{"name":"hkinfrastruktur","@id":"https:\/\/hkinfrastruktur.com\/#\/schema\/person\/e0d1e365a4050beb34e1a991f132a46f"},"headline":"Implementasi BIM, HKI Sambungkan Tol Pekanbaru &#8211; Bangkinang","datePublished":"2022-06-06T04:33:20+00:00","dateModified":"2024-12-04T01:05:11+00:00","mainEntityOfPage":{"@id":"https:\/\/hkinfrastruktur.com\/implementasi-bim-hki-sambungkan-tol-pekanbaru-bangkinang\/"},"wordCount":503,"publisher":{"@id":"https:\/\/hkinfrastruktur.com\/#organization"},"image":{"@id":"https:\/\/hkinfrastruktur.com\/implementasi-bim-hki-sambungkan-tol-pekanbaru-bangkinang\/#primaryimage"},"thumbnailUrl":"https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2022\/06\/Overpass-Sta-33318.105.jpg","articleSection":["Berita Perusahaan","Siaran Pers"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/hkinfrastruktur.com\/implementasi-bim-hki-sambungkan-tol-pekanbaru-bangkinang\/","url":"https:\/\/hkinfrastruktur.com\/implementasi-bim-hki-sambungkan-tol-pekanbaru-bangkinang\/","name":"Implementasi BIM, HKI Sambungkan Tol Pekanbaru - Bangkinang - PT Hutama Karya Infrastruktur (HKI)","isPartOf":{"@id":"https:\/\/hkinfrastruktur.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/hkinfrastruktur.com\/implementasi-bim-hki-sambungkan-tol-pekanbaru-bangkinang\/#primaryimage"},"image":{"@id":"https:\/\/hkinfrastruktur.com\/implementasi-bim-hki-sambungkan-tol-pekanbaru-bangkinang\/#primaryimage"},"thumbnailUrl":"https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2022\/06\/Overpass-Sta-33318.105.jpg","datePublished":"2022-06-06T04:33:20+00:00","dateModified":"2024-12-04T01:05:11+00:00","description":"Pekanbaru \u2013 PT Hutama Karya Infrastruktur (HKI) has completed part of the Pekanbaru-Bangkinang Toll Road, one of the sections in the Trans Sumatra Toll Road (JTTS) Pekanbaru-Padang segment. HKI has successfully finished 31 km of the total 40 km of the toll road.\u00a0","breadcrumb":{"@id":"https:\/\/hkinfrastruktur.com\/implementasi-bim-hki-sambungkan-tol-pekanbaru-bangkinang\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/hkinfrastruktur.com\/implementasi-bim-hki-sambungkan-tol-pekanbaru-bangkinang\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/hkinfrastruktur.com\/implementasi-bim-hki-sambungkan-tol-pekanbaru-bangkinang\/#primaryimage","url":"https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2022\/06\/Overpass-Sta-33318.105.jpg","contentUrl":"https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2022\/06\/Overpass-Sta-33318.105.jpg","width":1600,"height":1067},{"@type":"BreadcrumbList","@id":"https:\/\/hkinfrastruktur.com\/implementasi-bim-hki-sambungkan-tol-pekanbaru-bangkinang\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/hkinfrastruktur.com\/"},{"@type":"ListItem","position":2,"name":"Implementasi BIM, HKI Sambungkan Tol Pekanbaru &#8211; Bangkinang"}]},{"@type":"WebSite","@id":"https:\/\/hkinfrastruktur.com\/#website","url":"https:\/\/hkinfrastruktur.com\/","name":"PT Hutama Karya Infrastruktur (HKI)","description":"","publisher":{"@id":"https:\/\/hkinfrastruktur.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/hkinfrastruktur.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/hkinfrastruktur.com\/#organization","name":"PT Hutama Karya Infrastruktur (HKI)","url":"https:\/\/hkinfrastruktur.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/hkinfrastruktur.com\/#\/schema\/logo\/image\/","url":"https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2024\/10\/logo-hki-02.png","contentUrl":"https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2024\/10\/logo-hki-02.png","width":1200,"height":619,"caption":"PT Hutama Karya Infrastruktur (HKI)"},"image":{"@id":"https:\/\/hkinfrastruktur.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.instagram.com\/hkinfrastruktur\/","https:\/\/www.youtube.com\/@hkinfrastruktur2682","https:\/\/www.linkedin.com\/company\/hk-infrastruktur"]},{"@type":"Person","@id":"https:\/\/hkinfrastruktur.com\/#\/schema\/person\/e0d1e365a4050beb34e1a991f132a46f","name":"hkinfrastruktur","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/d14410bbaff367aee49a31c9d6ecf9d3f8c689d7a876045e36e65ebaeffcf988?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d14410bbaff367aee49a31c9d6ecf9d3f8c689d7a876045e36e65ebaeffcf988?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d14410bbaff367aee49a31c9d6ecf9d3f8c689d7a876045e36e65ebaeffcf988?s=96&d=mm&r=g","caption":"hkinfrastruktur"},"sameAs":["https:\/\/hkinfrastruktur.com"],"url":"https:\/\/hkinfrastruktur.com\/en\/author\/hkinfrastruktur\/"}]}},"_links":{"self":[{"href":"https:\/\/hkinfrastruktur.com\/en\/wp-json\/wp\/v2\/posts\/5346","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hkinfrastruktur.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hkinfrastruktur.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hkinfrastruktur.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/hkinfrastruktur.com\/en\/wp-json\/wp\/v2\/comments?post=5346"}],"version-history":[{"count":1,"href":"https:\/\/hkinfrastruktur.com\/en\/wp-json\/wp\/v2\/posts\/5346\/revisions"}],"predecessor-version":[{"id":6729,"href":"https:\/\/hkinfrastruktur.com\/en\/wp-json\/wp\/v2\/posts\/5346\/revisions\/6729"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hkinfrastruktur.com\/en\/wp-json\/wp\/v2\/media\/6726"}],"wp:attachment":[{"href":"https:\/\/hkinfrastruktur.com\/en\/wp-json\/wp\/v2\/media?parent=5346"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hkinfrastruktur.com\/en\/wp-json\/wp\/v2\/categories?post=5346"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hkinfrastruktur.com\/en\/wp-json\/wp\/v2\/tags?post=5346"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}