{"id":7300,"date":"2025-02-07T10:00:35","date_gmt":"2025-02-07T03:00:35","guid":{"rendered":"https:\/\/hkinfrastruktur.com\/?p=7300"},"modified":"2025-06-03T15:38:04","modified_gmt":"2025-06-03T08:38:04","slug":"kso-hki-acset-nk-kebut-pengerjaan-tol-probolinggo-banyuwangi-paket-ii-capai-progres-8191","status":"publish","type":"post","link":"https:\/\/hkinfrastruktur.com\/en\/kso-hki-acset-nk-kebut-pengerjaan-tol-probolinggo-banyuwangi-paket-ii-capai-progres-8191\/","title":{"rendered":"KSO HKI-Acset-NK Accelerates Construction of the Probolinggo-Banyuwangi Toll Road Package II, Achieving 81.91% Progress"},"content":{"rendered":"<p style=\"text-align: justify;\"><strong>East Java<\/strong> \u2013 The joint operation (KSO) of PT Hutama Karya Infrastruktur (HKI), PT Acset Indonusa Tbk (Acset), and PT Nindya Karya (NK) continues the construction of the Probolinggo-Banyuwangi Toll Road Package II STA 09+000 \u2013 20+200, spanning 11.20 km. \u201cAs of January 2025, the progress of this toll road project has reached 81.91%,\u201d said Aditya Novendra Jaya, Director of Operations III at HKI.<\/p>\n<p>The toll road, connecting Kraksaan to Paiton, will later be connected to the Gending-Kraksaan toll road, which is 12.88 km long and became operational during the 2024 Christmas and New Year holidays. In terms of structural facilities, this toll road will feature one interchange, the Paiton Interchange at STA 19+591, providing access to and from Paiton. Additionally, the toll road is designed with a 2x2 lane configuration and a planned speed of 100 km\/h.<\/p>\n<p>To accelerate construction on-site, the KSO HKI-Acset-NK is implementing the Deep Cement Mixing (DCM) method. DCM is a soil improvement technique used to enhance the stability and strength of the subsoil in construction projects by drilling into the ground and filling it with cement. This method is effective in stabilizing unstable soil to better support the toll road's structure.<\/p>\n<p>\u201cThe use of DCM in the Probolinggo-Banyuwangi Toll Road Package II project is one of the first implementations of this method in toll road construction. Typically, this technique is used by contractors in building construction projects,\u201d explained Aditya.<\/p>\n<p>In addition to DCM, the construction of the Probolinggo-Banyuwangi Toll Road Package II also utilizes Building Information Modeling (BIM) supported by Light Detection and Ranging (LiDAR) technology to create topographic maps and 3D models of the area to be developed. By using BIM, the construction process on-site becomes more effective due to thorough and detailed planning, which helps reduce rework and waste.<\/p>\n<p>Once operational, the Probolinggo-Banyuwangi Toll Road Package II will accelerate the delivery of logistics to and from East Java and boost the economy in the surrounding areas. \u201cWe kindly ask for the support and prayers of the community so that we can successfully complete the Probolinggo-Banyuwangi Toll Road Package II Kraksaan-Paiton section and bring positive impact to the people of East Java and its surroundings,\u201d Aditya concluded.<\/p>\n<p>As a point of information, HKI has completed the construction of approximately 435.92 km of the Trans Sumatra Toll Road (JTTS). Other toll sections currently under construction include the Pekanbaru Ring Road (30.57 km), Betung-Jambi Section 1A (30.8 km), Betung-Jambi Section 1B (31.6 km), Betung-Jambi Section 2A (35.92 km), Betung-Jambi Section 2B (18.4 km), Betung-Jambi Section IV (18.5 km), Palembang-Betung Section III (14.6 km), and Palembang-Betung Structure (10.12 km). Additionally, for non-JTTS projects, HKI is also working on the Jakarta-Cikampek Selatan II Toll Road Package IIA (11.3 km).<\/p>","protected":false},"excerpt":{"rendered":"<p>East Java \u2013 The joint operation (KSO) of PT Hutama Karya Infrastruktur (HKI), PT Acset Indonusa Tbk (Acset), and PT Nindya Karya (NK) continues the construction of the Probolinggo-Banyuwangi Toll Road Package II STA 09+000 \u2013 20+200, spanning 11.20 km.<\/p>","protected":false},"author":4,"featured_media":7302,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"iawp_total_views":133,"footnotes":""},"categories":[7,8],"tags":[],"class_list":["post-7300","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-berita-perusahaan","category-siaran-pers"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>KSO HKI-Acset-NK Kebut Pengerjaan Tol Probolinggo-Banyuwangi Paket II, Capai Progres 81,91% - PT Hutama Karya Infrastruktur (HKI)<\/title>\n<meta name=\"description\" content=\"Jawa Timur \u2013\u00a0Kerja sama operasi (KSO) PT Hutama Karya Infrastruktur (HKI), PT Acset Indonusa Tbk (Acset), dan PT Nindya Karya (NK) terus mengerjakan Jalan Tol Probolinggo \u2013 Banyuwangi Paket II STA 09+000 \u2013 20+200 sepanjang 11,20 km.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/hkinfrastruktur.com\/en\/kso-hki-acset-nk-kebut-pengerjaan-tol-probolinggo-banyuwangi-paket-ii-capai-progres-8191\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"KSO HKI-Acset-NK Kebut Pengerjaan Tol Probolinggo-Banyuwangi Paket II, Capai Progres 81,91% - PT Hutama Karya Infrastruktur (HKI)\" \/>\n<meta property=\"og:description\" content=\"Jawa Timur \u2013\u00a0Kerja sama operasi (KSO) PT Hutama Karya Infrastruktur (HKI), PT Acset Indonusa Tbk (Acset), dan PT Nindya Karya (NK) terus mengerjakan Jalan Tol Probolinggo \u2013 Banyuwangi Paket II STA 09+000 \u2013 20+200 sepanjang 11,20 km.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/hkinfrastruktur.com\/en\/kso-hki-acset-nk-kebut-pengerjaan-tol-probolinggo-banyuwangi-paket-ii-capai-progres-8191\/\" \/>\n<meta property=\"og:site_name\" content=\"PT Hutama Karya Infrastruktur (HKI)\" \/>\n<meta property=\"article:published_time\" content=\"2025-02-07T03:00:35+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-06-03T08:38:04+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/02\/Jalan-Tol-Probolinggo-Banyuwangi-1024x576.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"576\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Carmelita Christiee\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Carmelita Christiee\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/kso-hki-acset-nk-kebut-pengerjaan-tol-probolinggo-banyuwangi-paket-ii-capai-progres-8191\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/kso-hki-acset-nk-kebut-pengerjaan-tol-probolinggo-banyuwangi-paket-ii-capai-progres-8191\\\/\"},\"author\":{\"name\":\"Carmelita Christiee\",\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/#\\\/schema\\\/person\\\/7bb72f00eeac526685b83e8c361be6dd\"},\"headline\":\"KSO HKI-Acset-NK Kebut Pengerjaan Tol Probolinggo-Banyuwangi Paket II, Capai Progres 81,91%\",\"datePublished\":\"2025-02-07T03:00:35+00:00\",\"dateModified\":\"2025-06-03T08:38:04+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/kso-hki-acset-nk-kebut-pengerjaan-tol-probolinggo-banyuwangi-paket-ii-capai-progres-8191\\\/\"},\"wordCount\":415,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/kso-hki-acset-nk-kebut-pengerjaan-tol-probolinggo-banyuwangi-paket-ii-capai-progres-8191\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/hkinfrastruktur.com\\\/wp-content\\\/uploads\\\/2025\\\/02\\\/Jalan-Tol-Probolinggo-Banyuwangi.png\",\"articleSection\":[\"Berita Perusahaan\",\"Siaran Pers\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/hkinfrastruktur.com\\\/kso-hki-acset-nk-kebut-pengerjaan-tol-probolinggo-banyuwangi-paket-ii-capai-progres-8191\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/kso-hki-acset-nk-kebut-pengerjaan-tol-probolinggo-banyuwangi-paket-ii-capai-progres-8191\\\/\",\"url\":\"https:\\\/\\\/hkinfrastruktur.com\\\/kso-hki-acset-nk-kebut-pengerjaan-tol-probolinggo-banyuwangi-paket-ii-capai-progres-8191\\\/\",\"name\":\"KSO HKI-Acset-NK Kebut Pengerjaan Tol Probolinggo-Banyuwangi Paket II, Capai Progres 81,91% - PT Hutama Karya Infrastruktur (HKI)\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/kso-hki-acset-nk-kebut-pengerjaan-tol-probolinggo-banyuwangi-paket-ii-capai-progres-8191\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/kso-hki-acset-nk-kebut-pengerjaan-tol-probolinggo-banyuwangi-paket-ii-capai-progres-8191\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/hkinfrastruktur.com\\\/wp-content\\\/uploads\\\/2025\\\/02\\\/Jalan-Tol-Probolinggo-Banyuwangi.png\",\"datePublished\":\"2025-02-07T03:00:35+00:00\",\"dateModified\":\"2025-06-03T08:38:04+00:00\",\"description\":\"Jawa Timur \u2013\u00a0Kerja sama operasi (KSO) PT Hutama Karya Infrastruktur (HKI), PT Acset Indonusa Tbk (Acset), dan PT Nindya Karya (NK) terus mengerjakan Jalan Tol Probolinggo \u2013 Banyuwangi Paket II STA 09+000 \u2013 20+200 sepanjang 11,20 km.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/kso-hki-acset-nk-kebut-pengerjaan-tol-probolinggo-banyuwangi-paket-ii-capai-progres-8191\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/hkinfrastruktur.com\\\/kso-hki-acset-nk-kebut-pengerjaan-tol-probolinggo-banyuwangi-paket-ii-capai-progres-8191\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/kso-hki-acset-nk-kebut-pengerjaan-tol-probolinggo-banyuwangi-paket-ii-capai-progres-8191\\\/#primaryimage\",\"url\":\"https:\\\/\\\/hkinfrastruktur.com\\\/wp-content\\\/uploads\\\/2025\\\/02\\\/Jalan-Tol-Probolinggo-Banyuwangi.png\",\"contentUrl\":\"https:\\\/\\\/hkinfrastruktur.com\\\/wp-content\\\/uploads\\\/2025\\\/02\\\/Jalan-Tol-Probolinggo-Banyuwangi.png\",\"width\":4160,\"height\":2340},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/kso-hki-acset-nk-kebut-pengerjaan-tol-probolinggo-banyuwangi-paket-ii-capai-progres-8191\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/hkinfrastruktur.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"KSO HKI-Acset-NK Kebut Pengerjaan Tol Probolinggo-Banyuwangi Paket II, Capai Progres 81,91%\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/#website\",\"url\":\"https:\\\/\\\/hkinfrastruktur.com\\\/\",\"name\":\"PT Hutama Karya Infrastruktur (HKI)\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/hkinfrastruktur.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/#organization\",\"name\":\"PT Hutama Karya Infrastruktur (HKI)\",\"url\":\"https:\\\/\\\/hkinfrastruktur.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/hkinfrastruktur.com\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/logo-hki-02.png\",\"contentUrl\":\"https:\\\/\\\/hkinfrastruktur.com\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/logo-hki-02.png\",\"width\":1200,\"height\":619,\"caption\":\"PT Hutama Karya Infrastruktur (HKI)\"},\"image\":{\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.instagram.com\\\/hkinfrastruktur\\\/\",\"https:\\\/\\\/www.youtube.com\\\/@hkinfrastruktur2682\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/hk-infrastruktur\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/#\\\/schema\\\/person\\\/7bb72f00eeac526685b83e8c361be6dd\",\"name\":\"Carmelita Christiee\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f8adef3a7872c3d5cb32061e0bf0ab51fbcff10c0b0e822cdc9e950b031563f8?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f8adef3a7872c3d5cb32061e0bf0ab51fbcff10c0b0e822cdc9e950b031563f8?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f8adef3a7872c3d5cb32061e0bf0ab51fbcff10c0b0e822cdc9e950b031563f8?s=96&d=mm&r=g\",\"caption\":\"Carmelita Christiee\"},\"sameAs\":[\"https:\\\/\\\/hkinfrastruktur.com\\\/\"],\"url\":\"https:\\\/\\\/hkinfrastruktur.com\\\/en\\\/author\\\/carmelitachristiee\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"KSO HKI-Acset-NK Kebut Pengerjaan Tol Probolinggo-Banyuwangi Paket II, Capai Progres 81,91% - PT Hutama Karya Infrastruktur (HKI)","description":"East Java \u2013 The joint operation (KSO) of PT Hutama Karya Infrastruktur (HKI), PT Acset Indonusa Tbk (Acset), and PT Nindya Karya (NK) continues the construction of the Probolinggo-Banyuwangi Toll Road Package II STA 09+000 \u2013 20+200, spanning 11.20 km.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/hkinfrastruktur.com\/en\/kso-hki-acset-nk-kebut-pengerjaan-tol-probolinggo-banyuwangi-paket-ii-capai-progres-8191\/","og_locale":"en_US","og_type":"article","og_title":"KSO HKI-Acset-NK Kebut Pengerjaan Tol Probolinggo-Banyuwangi Paket II, Capai Progres 81,91% - PT Hutama Karya Infrastruktur (HKI)","og_description":"Jawa Timur \u2013\u00a0Kerja sama operasi (KSO) PT Hutama Karya Infrastruktur (HKI), PT Acset Indonusa Tbk (Acset), dan PT Nindya Karya (NK) terus mengerjakan Jalan Tol Probolinggo \u2013 Banyuwangi Paket II STA 09+000 \u2013 20+200 sepanjang 11,20 km.","og_url":"https:\/\/hkinfrastruktur.com\/en\/kso-hki-acset-nk-kebut-pengerjaan-tol-probolinggo-banyuwangi-paket-ii-capai-progres-8191\/","og_site_name":"PT Hutama Karya Infrastruktur (HKI)","article_published_time":"2025-02-07T03:00:35+00:00","article_modified_time":"2025-06-03T08:38:04+00:00","og_image":[{"width":1024,"height":576,"url":"https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/02\/Jalan-Tol-Probolinggo-Banyuwangi-1024x576.png","type":"image\/png"}],"author":"Carmelita Christiee","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Carmelita Christiee","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/hkinfrastruktur.com\/kso-hki-acset-nk-kebut-pengerjaan-tol-probolinggo-banyuwangi-paket-ii-capai-progres-8191\/#article","isPartOf":{"@id":"https:\/\/hkinfrastruktur.com\/kso-hki-acset-nk-kebut-pengerjaan-tol-probolinggo-banyuwangi-paket-ii-capai-progres-8191\/"},"author":{"name":"Carmelita Christiee","@id":"https:\/\/hkinfrastruktur.com\/#\/schema\/person\/7bb72f00eeac526685b83e8c361be6dd"},"headline":"KSO HKI-Acset-NK Kebut Pengerjaan Tol Probolinggo-Banyuwangi Paket II, Capai Progres 81,91%","datePublished":"2025-02-07T03:00:35+00:00","dateModified":"2025-06-03T08:38:04+00:00","mainEntityOfPage":{"@id":"https:\/\/hkinfrastruktur.com\/kso-hki-acset-nk-kebut-pengerjaan-tol-probolinggo-banyuwangi-paket-ii-capai-progres-8191\/"},"wordCount":415,"commentCount":0,"publisher":{"@id":"https:\/\/hkinfrastruktur.com\/#organization"},"image":{"@id":"https:\/\/hkinfrastruktur.com\/kso-hki-acset-nk-kebut-pengerjaan-tol-probolinggo-banyuwangi-paket-ii-capai-progres-8191\/#primaryimage"},"thumbnailUrl":"https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/02\/Jalan-Tol-Probolinggo-Banyuwangi.png","articleSection":["Berita Perusahaan","Siaran Pers"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/hkinfrastruktur.com\/kso-hki-acset-nk-kebut-pengerjaan-tol-probolinggo-banyuwangi-paket-ii-capai-progres-8191\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/hkinfrastruktur.com\/kso-hki-acset-nk-kebut-pengerjaan-tol-probolinggo-banyuwangi-paket-ii-capai-progres-8191\/","url":"https:\/\/hkinfrastruktur.com\/kso-hki-acset-nk-kebut-pengerjaan-tol-probolinggo-banyuwangi-paket-ii-capai-progres-8191\/","name":"KSO HKI-Acset-NK Kebut Pengerjaan Tol Probolinggo-Banyuwangi Paket II, Capai Progres 81,91% - PT Hutama Karya Infrastruktur (HKI)","isPartOf":{"@id":"https:\/\/hkinfrastruktur.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/hkinfrastruktur.com\/kso-hki-acset-nk-kebut-pengerjaan-tol-probolinggo-banyuwangi-paket-ii-capai-progres-8191\/#primaryimage"},"image":{"@id":"https:\/\/hkinfrastruktur.com\/kso-hki-acset-nk-kebut-pengerjaan-tol-probolinggo-banyuwangi-paket-ii-capai-progres-8191\/#primaryimage"},"thumbnailUrl":"https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/02\/Jalan-Tol-Probolinggo-Banyuwangi.png","datePublished":"2025-02-07T03:00:35+00:00","dateModified":"2025-06-03T08:38:04+00:00","description":"East Java \u2013 The joint operation (KSO) of PT Hutama Karya Infrastruktur (HKI), PT Acset Indonusa Tbk (Acset), and PT Nindya Karya (NK) continues the construction of the Probolinggo-Banyuwangi Toll Road Package II STA 09+000 \u2013 20+200, spanning 11.20 km.","breadcrumb":{"@id":"https:\/\/hkinfrastruktur.com\/kso-hki-acset-nk-kebut-pengerjaan-tol-probolinggo-banyuwangi-paket-ii-capai-progres-8191\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/hkinfrastruktur.com\/kso-hki-acset-nk-kebut-pengerjaan-tol-probolinggo-banyuwangi-paket-ii-capai-progres-8191\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/hkinfrastruktur.com\/kso-hki-acset-nk-kebut-pengerjaan-tol-probolinggo-banyuwangi-paket-ii-capai-progres-8191\/#primaryimage","url":"https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/02\/Jalan-Tol-Probolinggo-Banyuwangi.png","contentUrl":"https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/02\/Jalan-Tol-Probolinggo-Banyuwangi.png","width":4160,"height":2340},{"@type":"BreadcrumbList","@id":"https:\/\/hkinfrastruktur.com\/kso-hki-acset-nk-kebut-pengerjaan-tol-probolinggo-banyuwangi-paket-ii-capai-progres-8191\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/hkinfrastruktur.com\/"},{"@type":"ListItem","position":2,"name":"KSO HKI-Acset-NK Kebut Pengerjaan Tol Probolinggo-Banyuwangi Paket II, Capai Progres 81,91%"}]},{"@type":"WebSite","@id":"https:\/\/hkinfrastruktur.com\/#website","url":"https:\/\/hkinfrastruktur.com\/","name":"PT Hutama Karya Infrastruktur (HKI)","description":"","publisher":{"@id":"https:\/\/hkinfrastruktur.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/hkinfrastruktur.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/hkinfrastruktur.com\/#organization","name":"PT Hutama Karya Infrastruktur (HKI)","url":"https:\/\/hkinfrastruktur.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/hkinfrastruktur.com\/#\/schema\/logo\/image\/","url":"https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2024\/10\/logo-hki-02.png","contentUrl":"https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2024\/10\/logo-hki-02.png","width":1200,"height":619,"caption":"PT Hutama Karya Infrastruktur (HKI)"},"image":{"@id":"https:\/\/hkinfrastruktur.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.instagram.com\/hkinfrastruktur\/","https:\/\/www.youtube.com\/@hkinfrastruktur2682","https:\/\/www.linkedin.com\/company\/hk-infrastruktur"]},{"@type":"Person","@id":"https:\/\/hkinfrastruktur.com\/#\/schema\/person\/7bb72f00eeac526685b83e8c361be6dd","name":"Carmelita Christiee","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/f8adef3a7872c3d5cb32061e0bf0ab51fbcff10c0b0e822cdc9e950b031563f8?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/f8adef3a7872c3d5cb32061e0bf0ab51fbcff10c0b0e822cdc9e950b031563f8?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/f8adef3a7872c3d5cb32061e0bf0ab51fbcff10c0b0e822cdc9e950b031563f8?s=96&d=mm&r=g","caption":"Carmelita Christiee"},"sameAs":["https:\/\/hkinfrastruktur.com\/"],"url":"https:\/\/hkinfrastruktur.com\/en\/author\/carmelitachristiee\/"}]}},"_links":{"self":[{"href":"https:\/\/hkinfrastruktur.com\/en\/wp-json\/wp\/v2\/posts\/7300","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hkinfrastruktur.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hkinfrastruktur.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hkinfrastruktur.com\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/hkinfrastruktur.com\/en\/wp-json\/wp\/v2\/comments?post=7300"}],"version-history":[{"count":4,"href":"https:\/\/hkinfrastruktur.com\/en\/wp-json\/wp\/v2\/posts\/7300\/revisions"}],"predecessor-version":[{"id":7540,"href":"https:\/\/hkinfrastruktur.com\/en\/wp-json\/wp\/v2\/posts\/7300\/revisions\/7540"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hkinfrastruktur.com\/en\/wp-json\/wp\/v2\/media\/7302"}],"wp:attachment":[{"href":"https:\/\/hkinfrastruktur.com\/en\/wp-json\/wp\/v2\/media?parent=7300"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hkinfrastruktur.com\/en\/wp-json\/wp\/v2\/categories?post=7300"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hkinfrastruktur.com\/en\/wp-json\/wp\/v2\/tags?post=7300"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}