{"id":7495,"date":"2025-05-27T17:15:44","date_gmt":"2025-05-27T10:15:44","guid":{"rendered":"https:\/\/hkinfrastruktur.com\/?p=7495"},"modified":"2025-06-03T15:34:21","modified_gmt":"2025-06-03T08:34:21","slug":"hki-bangun-rest-area-padang-sicincin-catatkan-progres-8006","status":"publish","type":"post","link":"https:\/\/hkinfrastruktur.com\/en\/hki-bangun-rest-area-padang-sicincin-catatkan-progres-8006\/","title":{"rendered":"HKI Constructs Rest Area on Padang\u2013Sicincin Toll Road, Records 80.06% Progress"},"content":{"rendered":"<p style=\"text-align: justify;\"><strong>Padang <\/strong>\u2013 PT Hutama Karya Infrastruktur (HKI), a subsidiary of PT Hutama Karya (Persero), is accelerating the construction of a rest area, also known as Service and Rest Area (TIP), on the Trans-Sumatra Toll Road (JTTS), specifically along the Padang\u2013Sicincin section. As of April 2025, the project\u2019s physical progress has reached 80.06%.<\/p>\n<p style=\"text-align: justify;\">\u201cThis project, located at STA 23+000, includes two rest areas\u2014one on each roadway. The rest area on route A serves traffic from Padang to Sicincin, while the one on route B serves traffic from Sicincin to Padang. We are committed to ensuring the project meets quality standards and is completed on schedule by June,\u201d said Aditya Novendra Jaya, Director of Operations III.<\/p>\n<p>The Padang\u2013Sicincin rest areas are classified as Type A, providing comprehensive facilities such as a mosque, public restrooms, a clinic, a workshop, a fuel station (SPBU), a management office, a wastewater treatment facility, a food court accommodating 16 MSME tenants, and one convenience store.<\/p>\n<p>By providing space for MSME tenants, it aims not only to support the local economy around Padang\u2013Sicincin, but also to serve as a strategic platform to showcase West Sumatra\u2019s unique culinary and cultural offerings to visitors.<\/p>\n<p>To ensure smooth traffic flow and user convenience, the rest area on route A provides parking for 211 Class I vehicles and 55 Class II\u2013V vehicles. On route B, parking is available for 210 Class I vehicles and 59 Class II\u2013V vehicles.<\/p>\n<p>The construction of the rest area utilizes modern construction technologies, including Building Information Modeling (BIM), which is used to create and manage digital representations of the physical and functional aspects of the facility.<\/p>\n<p>Architecturally, the rest area adopts a neo-vernacular design inspired by Minangkabau culture. The buildings feature contemporary materials combined with traditional Minang elements, including the iconic roof design, decorative patterns resembling crowns, bat wings, fish fins, and traditional carvings\u2014all crafted by local artisans.<\/p>\n<p>\u201cHKI is not only focused on physical construction, but also on preserving cultural heritage. To ensure the architectural elements represent Minangkabau culture accurately, we collaborated with Minangkabau cultural specialists on the gonjong roofing (the pointed, upward-sweeping roofs) for the food court buildings,\u201d Aditya added.<\/p>\n<p>Once completed, the rest areas along the Padang\u2013Sicincin Toll Road are expected to enhance the experience and comfort of travelers while also supporting smoother traffic flow on the toll road.<\/p>\n<p>HKI is currently working on several other projects within the Trans-Sumatra Toll Road (JTTS) network, including the Pekanbaru Ring Road, Simpang Palembang\u2013Indralaya, Palembang\u2013Betung Section III, Palembang\u2013Betung Structure, Betung\u2013Jambi Sections IA, IB, 2A, 2B, and IV, and the Medan\u2013Binjai Toll Road Rest Area. Outside the JTTS network, HKI is also constructing the Probolinggo\u2013Banyuwangi Toll Road Package II and the Jakarta\u2013Cikampek Selatan Toll Road Package 2A.<\/p>\n<p><img decoding=\"async\" class=\"alignnone wp-image-7499\" src=\"https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/05\/RA-Padang-Sicincin3.jpeg\" alt=\"\" width=\"307\" height=\"230\" srcset=\"https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/05\/RA-Padang-Sicincin3-16x12.jpeg 16w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/05\/RA-Padang-Sicincin3-200x150.jpeg 200w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/05\/RA-Padang-Sicincin3-300x225.jpeg 300w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/05\/RA-Padang-Sicincin3-400x300.jpeg 400w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/05\/RA-Padang-Sicincin3-600x450.jpeg 600w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/05\/RA-Padang-Sicincin3-768x576.jpeg 768w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/05\/RA-Padang-Sicincin3-800x600.jpeg 800w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/05\/RA-Padang-Sicincin3-1024x768.jpeg 1024w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/05\/RA-Padang-Sicincin3-1200x900.jpeg 1200w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/05\/RA-Padang-Sicincin3-1536x1152.jpeg 1536w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/05\/RA-Padang-Sicincin3.jpeg 1600w\" sizes=\"(max-width: 307px) 100vw, 307px\" \/> \u00a0<img decoding=\"async\" class=\"alignnone wp-image-7497\" src=\"https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/05\/RA-Padang-Sicincin1.jpeg\" alt=\"\" width=\"307\" height=\"230\" srcset=\"https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/05\/RA-Padang-Sicincin1-16x12.jpeg 16w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/05\/RA-Padang-Sicincin1-200x150.jpeg 200w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/05\/RA-Padang-Sicincin1-300x225.jpeg 300w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/05\/RA-Padang-Sicincin1-400x300.jpeg 400w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/05\/RA-Padang-Sicincin1-600x450.jpeg 600w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/05\/RA-Padang-Sicincin1-768x576.jpeg 768w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/05\/RA-Padang-Sicincin1-800x600.jpeg 800w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/05\/RA-Padang-Sicincin1-1024x768.jpeg 1024w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/05\/RA-Padang-Sicincin1-1200x900.jpeg 1200w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/05\/RA-Padang-Sicincin1-1536x1152.jpeg 1536w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/05\/RA-Padang-Sicincin1.jpeg 1600w\" sizes=\"(max-width: 307px) 100vw, 307px\" \/>\u00a0 <img decoding=\"async\" class=\"alignnone wp-image-7500\" src=\"https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/05\/RA-Padang-Sicincin4.jpeg\" alt=\"\" width=\"308\" height=\"231\" srcset=\"https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/05\/RA-Padang-Sicincin4-16x12.jpeg 16w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/05\/RA-Padang-Sicincin4-200x150.jpeg 200w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/05\/RA-Padang-Sicincin4-300x225.jpeg 300w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/05\/RA-Padang-Sicincin4-400x300.jpeg 400w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/05\/RA-Padang-Sicincin4-600x450.jpeg 600w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/05\/RA-Padang-Sicincin4-768x576.jpeg 768w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/05\/RA-Padang-Sicincin4-800x600.jpeg 800w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/05\/RA-Padang-Sicincin4-1024x768.jpeg 1024w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/05\/RA-Padang-Sicincin4-1200x900.jpeg 1200w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/05\/RA-Padang-Sicincin4-1536x1152.jpeg 1536w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/05\/RA-Padang-Sicincin4.jpeg 1600w\" sizes=\"(max-width: 308px) 100vw, 308px\" \/><\/p>","protected":false},"excerpt":{"rendered":"<p>Padang \u2013 PT Hutama Karya Infrastruktur (HKI) is accelerating the construction of a rest area, also known as Service and Rest Area (TIP), on the Trans-Sumatra Toll Road (JTTS), specifically along the Padang\u2013Sicincin section. As of April 2025, the project\u2019s physical progress has reached 80.06%.\u00a0\u00a0<\/p>","protected":false},"author":1,"featured_media":7498,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"iawp_total_views":61,"footnotes":""},"categories":[7,8],"tags":[],"class_list":["post-7495","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-berita-perusahaan","category-siaran-pers"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>HKI Bangun Rest Area Padang\u2013Sicincin,\u00a0Catatkan Progres 80,06% - PT Hutama Karya Infrastruktur (HKI)<\/title>\n<meta name=\"description\" content=\"Padang - PT Hutama Karya Infrastruktur (HKI) mempercepat pembangunan rest area atau Tempat Istirahat Pelayanan (TIP) di Jalan Tol Trans Sumatera (JTTS) yaitu tepatnya di Ruas Padang \u2013 Sicincin. Hingga April 2025, progres fisik proyek ini telah mencapai 80,06 %.\u00a0\u00a0\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/hkinfrastruktur.com\/en\/hki-bangun-rest-area-padang-sicincin-catatkan-progres-8006\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"HKI Bangun Rest Area Padang\u2013Sicincin,\u00a0Catatkan Progres 80,06% - PT Hutama Karya Infrastruktur (HKI)\" \/>\n<meta property=\"og:description\" content=\"Padang - PT Hutama Karya Infrastruktur (HKI) mempercepat pembangunan rest area atau Tempat Istirahat Pelayanan (TIP) di Jalan Tol Trans Sumatera (JTTS) yaitu tepatnya di Ruas Padang \u2013 Sicincin. Hingga April 2025, progres fisik proyek ini telah mencapai 80,06 %.\u00a0\u00a0\" \/>\n<meta property=\"og:url\" content=\"https:\/\/hkinfrastruktur.com\/en\/hki-bangun-rest-area-padang-sicincin-catatkan-progres-8006\/\" \/>\n<meta property=\"og:site_name\" content=\"PT Hutama Karya Infrastruktur (HKI)\" \/>\n<meta property=\"article:published_time\" content=\"2025-05-27T10:15:44+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-06-03T08:34:21+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/05\/RA-Padang-Sicincin2.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"1600\" \/>\n\t<meta property=\"og:image:height\" content=\"1200\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"hkinfrastruktur\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"hkinfrastruktur\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/hki-bangun-rest-area-padang-sicincin-catatkan-progres-8006\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/hki-bangun-rest-area-padang-sicincin-catatkan-progres-8006\\\/\"},\"author\":{\"name\":\"hkinfrastruktur\",\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/#\\\/schema\\\/person\\\/e0d1e365a4050beb34e1a991f132a46f\"},\"headline\":\"HKI Bangun Rest Area Padang\u2013Sicincin,\u00a0Catatkan Progres 80,06%\",\"datePublished\":\"2025-05-27T10:15:44+00:00\",\"dateModified\":\"2025-06-03T08:34:21+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/hki-bangun-rest-area-padang-sicincin-catatkan-progres-8006\\\/\"},\"wordCount\":432,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/hki-bangun-rest-area-padang-sicincin-catatkan-progres-8006\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/hkinfrastruktur.com\\\/wp-content\\\/uploads\\\/2025\\\/05\\\/RA-Padang-Sicincin2.jpeg\",\"articleSection\":[\"Berita Perusahaan\",\"Siaran Pers\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/hkinfrastruktur.com\\\/hki-bangun-rest-area-padang-sicincin-catatkan-progres-8006\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/hki-bangun-rest-area-padang-sicincin-catatkan-progres-8006\\\/\",\"url\":\"https:\\\/\\\/hkinfrastruktur.com\\\/hki-bangun-rest-area-padang-sicincin-catatkan-progres-8006\\\/\",\"name\":\"HKI Bangun Rest Area Padang\u2013Sicincin,\u00a0Catatkan Progres 80,06% - PT Hutama Karya Infrastruktur (HKI)\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/hki-bangun-rest-area-padang-sicincin-catatkan-progres-8006\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/hki-bangun-rest-area-padang-sicincin-catatkan-progres-8006\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/hkinfrastruktur.com\\\/wp-content\\\/uploads\\\/2025\\\/05\\\/RA-Padang-Sicincin2.jpeg\",\"datePublished\":\"2025-05-27T10:15:44+00:00\",\"dateModified\":\"2025-06-03T08:34:21+00:00\",\"description\":\"Padang - PT Hutama Karya Infrastruktur (HKI) mempercepat pembangunan rest area atau Tempat Istirahat Pelayanan (TIP) di Jalan Tol Trans Sumatera (JTTS) yaitu tepatnya di Ruas Padang \u2013 Sicincin. Hingga April 2025, progres fisik proyek ini telah mencapai 80,06 %.\u00a0\u00a0\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/hki-bangun-rest-area-padang-sicincin-catatkan-progres-8006\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/hkinfrastruktur.com\\\/hki-bangun-rest-area-padang-sicincin-catatkan-progres-8006\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/hki-bangun-rest-area-padang-sicincin-catatkan-progres-8006\\\/#primaryimage\",\"url\":\"https:\\\/\\\/hkinfrastruktur.com\\\/wp-content\\\/uploads\\\/2025\\\/05\\\/RA-Padang-Sicincin2.jpeg\",\"contentUrl\":\"https:\\\/\\\/hkinfrastruktur.com\\\/wp-content\\\/uploads\\\/2025\\\/05\\\/RA-Padang-Sicincin2.jpeg\",\"width\":1600,\"height\":1200},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/hki-bangun-rest-area-padang-sicincin-catatkan-progres-8006\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/hkinfrastruktur.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"HKI Bangun Rest Area Padang\u2013Sicincin,\u00a0Catatkan Progres 80,06%\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/#website\",\"url\":\"https:\\\/\\\/hkinfrastruktur.com\\\/\",\"name\":\"PT Hutama Karya Infrastruktur (HKI)\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/hkinfrastruktur.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/#organization\",\"name\":\"PT Hutama Karya Infrastruktur (HKI)\",\"url\":\"https:\\\/\\\/hkinfrastruktur.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/hkinfrastruktur.com\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/logo-hki-02.png\",\"contentUrl\":\"https:\\\/\\\/hkinfrastruktur.com\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/logo-hki-02.png\",\"width\":1200,\"height\":619,\"caption\":\"PT Hutama Karya Infrastruktur (HKI)\"},\"image\":{\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.instagram.com\\\/hkinfrastruktur\\\/\",\"https:\\\/\\\/www.youtube.com\\\/@hkinfrastruktur2682\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/hk-infrastruktur\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/#\\\/schema\\\/person\\\/e0d1e365a4050beb34e1a991f132a46f\",\"name\":\"hkinfrastruktur\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d14410bbaff367aee49a31c9d6ecf9d3f8c689d7a876045e36e65ebaeffcf988?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d14410bbaff367aee49a31c9d6ecf9d3f8c689d7a876045e36e65ebaeffcf988?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d14410bbaff367aee49a31c9d6ecf9d3f8c689d7a876045e36e65ebaeffcf988?s=96&d=mm&r=g\",\"caption\":\"hkinfrastruktur\"},\"sameAs\":[\"https:\\\/\\\/hkinfrastruktur.com\"],\"url\":\"https:\\\/\\\/hkinfrastruktur.com\\\/en\\\/author\\\/hkinfrastruktur\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"HKI Bangun Rest Area Padang\u2013Sicincin,\u00a0Catatkan Progres 80,06% - PT Hutama Karya Infrastruktur (HKI)","description":"Padang - PT Hutama Karya Infrastruktur (HKI) mempercepat pembangunan rest area atau Tempat Istirahat Pelayanan (TIP) di Jalan Tol Trans Sumatera (JTTS) yaitu tepatnya di Ruas Padang \u2013 Sicincin. Hingga April 2025, progres fisik proyek ini telah mencapai 80,06 %.\u00a0\u00a0","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/hkinfrastruktur.com\/en\/hki-bangun-rest-area-padang-sicincin-catatkan-progres-8006\/","og_locale":"en_US","og_type":"article","og_title":"HKI Bangun Rest Area Padang\u2013Sicincin,\u00a0Catatkan Progres 80,06% - PT Hutama Karya Infrastruktur (HKI)","og_description":"Padang - PT Hutama Karya Infrastruktur (HKI) mempercepat pembangunan rest area atau Tempat Istirahat Pelayanan (TIP) di Jalan Tol Trans Sumatera (JTTS) yaitu tepatnya di Ruas Padang \u2013 Sicincin. Hingga April 2025, progres fisik proyek ini telah mencapai 80,06 %.\u00a0\u00a0","og_url":"https:\/\/hkinfrastruktur.com\/en\/hki-bangun-rest-area-padang-sicincin-catatkan-progres-8006\/","og_site_name":"PT Hutama Karya Infrastruktur (HKI)","article_published_time":"2025-05-27T10:15:44+00:00","article_modified_time":"2025-06-03T08:34:21+00:00","og_image":[{"width":1600,"height":1200,"url":"https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/05\/RA-Padang-Sicincin2.jpeg","type":"image\/jpeg"}],"author":"hkinfrastruktur","twitter_card":"summary_large_image","twitter_misc":{"Written by":"hkinfrastruktur","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/hkinfrastruktur.com\/hki-bangun-rest-area-padang-sicincin-catatkan-progres-8006\/#article","isPartOf":{"@id":"https:\/\/hkinfrastruktur.com\/hki-bangun-rest-area-padang-sicincin-catatkan-progres-8006\/"},"author":{"name":"hkinfrastruktur","@id":"https:\/\/hkinfrastruktur.com\/#\/schema\/person\/e0d1e365a4050beb34e1a991f132a46f"},"headline":"HKI Bangun Rest Area Padang\u2013Sicincin,\u00a0Catatkan Progres 80,06%","datePublished":"2025-05-27T10:15:44+00:00","dateModified":"2025-06-03T08:34:21+00:00","mainEntityOfPage":{"@id":"https:\/\/hkinfrastruktur.com\/hki-bangun-rest-area-padang-sicincin-catatkan-progres-8006\/"},"wordCount":432,"commentCount":0,"publisher":{"@id":"https:\/\/hkinfrastruktur.com\/#organization"},"image":{"@id":"https:\/\/hkinfrastruktur.com\/hki-bangun-rest-area-padang-sicincin-catatkan-progres-8006\/#primaryimage"},"thumbnailUrl":"https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/05\/RA-Padang-Sicincin2.jpeg","articleSection":["Berita Perusahaan","Siaran Pers"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/hkinfrastruktur.com\/hki-bangun-rest-area-padang-sicincin-catatkan-progres-8006\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/hkinfrastruktur.com\/hki-bangun-rest-area-padang-sicincin-catatkan-progres-8006\/","url":"https:\/\/hkinfrastruktur.com\/hki-bangun-rest-area-padang-sicincin-catatkan-progres-8006\/","name":"HKI Bangun Rest Area Padang\u2013Sicincin,\u00a0Catatkan Progres 80,06% - PT Hutama Karya Infrastruktur (HKI)","isPartOf":{"@id":"https:\/\/hkinfrastruktur.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/hkinfrastruktur.com\/hki-bangun-rest-area-padang-sicincin-catatkan-progres-8006\/#primaryimage"},"image":{"@id":"https:\/\/hkinfrastruktur.com\/hki-bangun-rest-area-padang-sicincin-catatkan-progres-8006\/#primaryimage"},"thumbnailUrl":"https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/05\/RA-Padang-Sicincin2.jpeg","datePublished":"2025-05-27T10:15:44+00:00","dateModified":"2025-06-03T08:34:21+00:00","description":"Padang - PT Hutama Karya Infrastruktur (HKI) mempercepat pembangunan rest area atau Tempat Istirahat Pelayanan (TIP) di Jalan Tol Trans Sumatera (JTTS) yaitu tepatnya di Ruas Padang \u2013 Sicincin. Hingga April 2025, progres fisik proyek ini telah mencapai 80,06 %.\u00a0\u00a0","breadcrumb":{"@id":"https:\/\/hkinfrastruktur.com\/hki-bangun-rest-area-padang-sicincin-catatkan-progres-8006\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/hkinfrastruktur.com\/hki-bangun-rest-area-padang-sicincin-catatkan-progres-8006\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/hkinfrastruktur.com\/hki-bangun-rest-area-padang-sicincin-catatkan-progres-8006\/#primaryimage","url":"https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/05\/RA-Padang-Sicincin2.jpeg","contentUrl":"https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/05\/RA-Padang-Sicincin2.jpeg","width":1600,"height":1200},{"@type":"BreadcrumbList","@id":"https:\/\/hkinfrastruktur.com\/hki-bangun-rest-area-padang-sicincin-catatkan-progres-8006\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/hkinfrastruktur.com\/"},{"@type":"ListItem","position":2,"name":"HKI Bangun Rest Area Padang\u2013Sicincin,\u00a0Catatkan Progres 80,06%"}]},{"@type":"WebSite","@id":"https:\/\/hkinfrastruktur.com\/#website","url":"https:\/\/hkinfrastruktur.com\/","name":"PT Hutama Karya Infrastruktur (HKI)","description":"","publisher":{"@id":"https:\/\/hkinfrastruktur.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/hkinfrastruktur.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/hkinfrastruktur.com\/#organization","name":"PT Hutama Karya Infrastruktur (HKI)","url":"https:\/\/hkinfrastruktur.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/hkinfrastruktur.com\/#\/schema\/logo\/image\/","url":"https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2024\/10\/logo-hki-02.png","contentUrl":"https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2024\/10\/logo-hki-02.png","width":1200,"height":619,"caption":"PT Hutama Karya Infrastruktur (HKI)"},"image":{"@id":"https:\/\/hkinfrastruktur.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.instagram.com\/hkinfrastruktur\/","https:\/\/www.youtube.com\/@hkinfrastruktur2682","https:\/\/www.linkedin.com\/company\/hk-infrastruktur"]},{"@type":"Person","@id":"https:\/\/hkinfrastruktur.com\/#\/schema\/person\/e0d1e365a4050beb34e1a991f132a46f","name":"hkinfrastruktur","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/d14410bbaff367aee49a31c9d6ecf9d3f8c689d7a876045e36e65ebaeffcf988?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d14410bbaff367aee49a31c9d6ecf9d3f8c689d7a876045e36e65ebaeffcf988?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d14410bbaff367aee49a31c9d6ecf9d3f8c689d7a876045e36e65ebaeffcf988?s=96&d=mm&r=g","caption":"hkinfrastruktur"},"sameAs":["https:\/\/hkinfrastruktur.com"],"url":"https:\/\/hkinfrastruktur.com\/en\/author\/hkinfrastruktur\/"}]}},"_links":{"self":[{"href":"https:\/\/hkinfrastruktur.com\/en\/wp-json\/wp\/v2\/posts\/7495","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hkinfrastruktur.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hkinfrastruktur.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hkinfrastruktur.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/hkinfrastruktur.com\/en\/wp-json\/wp\/v2\/comments?post=7495"}],"version-history":[{"count":4,"href":"https:\/\/hkinfrastruktur.com\/en\/wp-json\/wp\/v2\/posts\/7495\/revisions"}],"predecessor-version":[{"id":7536,"href":"https:\/\/hkinfrastruktur.com\/en\/wp-json\/wp\/v2\/posts\/7495\/revisions\/7536"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hkinfrastruktur.com\/en\/wp-json\/wp\/v2\/media\/7498"}],"wp:attachment":[{"href":"https:\/\/hkinfrastruktur.com\/en\/wp-json\/wp\/v2\/media?parent=7495"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hkinfrastruktur.com\/en\/wp-json\/wp\/v2\/categories?post=7495"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hkinfrastruktur.com\/en\/wp-json\/wp\/v2\/tags?post=7495"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}