{"id":7824,"date":"2025-09-19T14:00:12","date_gmt":"2025-09-19T07:00:12","guid":{"rendered":"https:\/\/hkinfrastruktur.com\/?p=7824"},"modified":"2025-10-08T14:23:54","modified_gmt":"2025-10-08T07:23:54","slug":"jalan-tol-probolinggo-banyuwangi-paket-ii-rampung-dibangun","status":"publish","type":"post","link":"https:\/\/hkinfrastruktur.com\/en\/jalan-tol-probolinggo-banyuwangi-paket-ii-rampung-dibangun\/","title":{"rendered":"Probolinggo\u2013Banyuwangi Toll Road Section II Completed \u2014 KSO HKI\u2013Acset\u2013NK Brings New Connectivity to East Java\u00a0"},"content":{"rendered":"<p style=\"text-align: justify;\"><b>East Java <\/b>\u2013 The joint operation (KSO) of PT Hutama Karya Infrastruktur (HKI), PT Acset Indonusa Tbk (Acset), and PT Nindya Karya (NK) has successfully completed the construction of the Probolinggo\u2013Banyuwangi Toll Road Section II in July. The 11.2-kilometer toll segment connects Kraksaan and Paiton, reducing travel time to just 10\u201315 minutes from the previous 30 minutes via the national road.<\/p>\n<p>HKI\u2019s Director of Operations III, Aditya Novendra Jaya, stated that the completion of this toll road will significantly enhance connectivity across East Java.\n\u201cIn this section, the KSO HKI\u2013Acset\u2013NK has also completed the construction of a toll gate in Paiton to facilitate entry and exit, as well as the toll operation building,\u201d he added.<br data-start=\"750\" data-end=\"753\" \/>\u201cPada tol ini, KSO HKI\u2013Acset\u2013NK juga telah menyelesaikan satu gerbang tol di Paiton sebagai akses keluar dan masuk, serta pembangunan gedung operasional tol,\u201d imbuhnya.<\/p>\n<p>Aditya further emphasized that the project upholds strong environmental, social, and governance (ESG) principles. One of the initiatives includes applying eco-friendly design concepts to the operational building.\n\u201cAt the Probolinggo\u2013Banyuwangi Toll Road Section II project, we utilized wide glass openings to maximize natural lighting, which helps reduce electricity consumption significantly,\u201d explained Aditya. <em>environmental, social, and governance<\/em> (ESG). Salah satunya dengan penerapan desain ramah lingkungan pada gedung operasional.\u00a0 \u201cPada proyek Jalan Tol Probolinggo\u2013Banyuwangi Paket II ini, Kami menggunakan kaca bukaan lebar (media opening) pada gedung operasional untuk memaksimalkan pencahayaan alami, sehingga dapat mengurangi konsumsi listrik secara signifikan,\u201d ujar Aditya.<\/p>\n<p>Beyond delivering high-quality infrastructure, the project has also brought tangible benefits to the local community \u2014 75% of the workforce involved in construction were local residents. Once operational, the toll road will open new connectivity in East Java, supporting tourism growth and the development of local MSMEs.<\/p>\n<p>The completion of this project reaffirms KSO HKI\u2013Acset\u2013NK\u2019s commitment to developing toll road infrastructure that not only enhances mobility but also creates social, economic, and environmental value for communities. The project aligns with Presidential Asta Cita Point No. 3, which aims to create quality employment, foster entrepreneurship, strengthen the creative industry, and advance infrastructure development.<\/p>\n<p><img decoding=\"async\" class=\"alignnone size-medium wp-image-7827\" src=\"https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/10\/WhatsApp-Image-2025-10-03-at-14.29.25_c531e52b-300x219.jpg\" alt=\"\" width=\"300\" height=\"219\" srcset=\"https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/10\/WhatsApp-Image-2025-10-03-at-14.29.25_c531e52b-16x12.jpg 16w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/10\/WhatsApp-Image-2025-10-03-at-14.29.25_c531e52b-200x146.jpg 200w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/10\/WhatsApp-Image-2025-10-03-at-14.29.25_c531e52b-300x219.jpg 300w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/10\/WhatsApp-Image-2025-10-03-at-14.29.25_c531e52b-400x293.jpg 400w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/10\/WhatsApp-Image-2025-10-03-at-14.29.25_c531e52b-600x439.jpg 600w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/10\/WhatsApp-Image-2025-10-03-at-14.29.25_c531e52b-768x562.jpg 768w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/10\/WhatsApp-Image-2025-10-03-at-14.29.25_c531e52b-800x585.jpg 800w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/10\/WhatsApp-Image-2025-10-03-at-14.29.25_c531e52b-1024x749.jpg 1024w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/10\/WhatsApp-Image-2025-10-03-at-14.29.25_c531e52b-1200x878.jpg 1200w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/10\/WhatsApp-Image-2025-10-03-at-14.29.25_c531e52b.jpg 1280w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/> \u00a0<img decoding=\"async\" class=\"alignnone size-medium wp-image-7826\" src=\"https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/10\/WhatsApp-Image-2025-10-03-at-14.29.25_053a309c-300x219.jpg\" alt=\"\" width=\"300\" height=\"219\" srcset=\"https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/10\/WhatsApp-Image-2025-10-03-at-14.29.25_053a309c-16x12.jpg 16w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/10\/WhatsApp-Image-2025-10-03-at-14.29.25_053a309c-200x146.jpg 200w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/10\/WhatsApp-Image-2025-10-03-at-14.29.25_053a309c-300x219.jpg 300w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/10\/WhatsApp-Image-2025-10-03-at-14.29.25_053a309c-400x293.jpg 400w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/10\/WhatsApp-Image-2025-10-03-at-14.29.25_053a309c-600x439.jpg 600w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/10\/WhatsApp-Image-2025-10-03-at-14.29.25_053a309c-768x562.jpg 768w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/10\/WhatsApp-Image-2025-10-03-at-14.29.25_053a309c-800x585.jpg 800w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/10\/WhatsApp-Image-2025-10-03-at-14.29.25_053a309c-1024x749.jpg 1024w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/10\/WhatsApp-Image-2025-10-03-at-14.29.25_053a309c-1200x878.jpg 1200w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/10\/WhatsApp-Image-2025-10-03-at-14.29.25_053a309c.jpg 1280w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/> \u00a0<img decoding=\"async\" class=\"alignnone size-medium wp-image-7828\" src=\"https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/10\/WhatsApp-Image-2025-10-03-at-14.29.26_c8a451a4-300x219.jpg\" alt=\"\" width=\"300\" height=\"219\" srcset=\"https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/10\/WhatsApp-Image-2025-10-03-at-14.29.26_c8a451a4-16x12.jpg 16w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/10\/WhatsApp-Image-2025-10-03-at-14.29.26_c8a451a4-200x146.jpg 200w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/10\/WhatsApp-Image-2025-10-03-at-14.29.26_c8a451a4-300x219.jpg 300w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/10\/WhatsApp-Image-2025-10-03-at-14.29.26_c8a451a4-400x293.jpg 400w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/10\/WhatsApp-Image-2025-10-03-at-14.29.26_c8a451a4-600x439.jpg 600w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/10\/WhatsApp-Image-2025-10-03-at-14.29.26_c8a451a4-768x562.jpg 768w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/10\/WhatsApp-Image-2025-10-03-at-14.29.26_c8a451a4-800x585.jpg 800w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/10\/WhatsApp-Image-2025-10-03-at-14.29.26_c8a451a4-1024x749.jpg 1024w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/10\/WhatsApp-Image-2025-10-03-at-14.29.26_c8a451a4-1200x878.jpg 1200w, https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/10\/WhatsApp-Image-2025-10-03-at-14.29.26_c8a451a4.jpg 1280w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>","protected":false},"excerpt":{"rendered":"<p>East Java \u2013 The joint operation (KSO) of PT Hutama Karya Infrastruktur (HKI), PT Acset Indonusa Tbk (Acset), and PT Nindya Karya (NK) has successfully completed the construction of the Probolinggo\u2013Banyuwangi Toll Road Section II in July. The 11.2-kilometer toll segment connects Kraksaan and Paiton, reducing travel time to just 10\u201315 minutes from the previous 30 minutes via the national road.\u00a0<\/p>","protected":false},"author":4,"featured_media":7825,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"iawp_total_views":27,"footnotes":""},"categories":[7,8],"tags":[],"class_list":["post-7824","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-berita-perusahaan","category-siaran-pers"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Jalan Tol Probolinggo-Banyuwangi Paket II Rampung Dibangun,\u00a0KSO HKI-Acset-NK\u00a0Hadirkan Konektivitas Baru di Jawa Timur\u00a0 - PT Hutama Karya Infrastruktur (HKI)<\/title>\n<meta name=\"description\" content=\"Jawa Timur \u2013 Kerja sama operasi (KSO) PT Hutama Karya Infrastruktur (HKI) \u2013 PT Acset Indonusa Tbk (Acset) \u2013 PT Nindya Karya (NK) (KSO HKI-Acset-NK) telah menyelesaikan pembangunan Tol Probolinggo \u2013 Banyuwangi Paket II pada Juli lalu. Jalan tol sepanjang 11,2 km ini akan menghubungkan Kraksaan-Paiton dengan waktu tempuh hanya 10-15 menit saja, yang sebelumnya bisa memakan waktu sekitar 30 menit melalui jalan nasional.\u00a0\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/hkinfrastruktur.com\/en\/jalan-tol-probolinggo-banyuwangi-paket-ii-rampung-dibangun\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Jalan Tol Probolinggo-Banyuwangi Paket II Rampung Dibangun,\u00a0KSO HKI-Acset-NK\u00a0Hadirkan Konektivitas Baru di Jawa Timur\u00a0 - PT Hutama Karya Infrastruktur (HKI)\" \/>\n<meta property=\"og:description\" content=\"Jawa Timur \u2013 Kerja sama operasi (KSO) PT Hutama Karya Infrastruktur (HKI) \u2013 PT Acset Indonusa Tbk (Acset) \u2013 PT Nindya Karya (NK) (KSO HKI-Acset-NK) telah menyelesaikan pembangunan Tol Probolinggo \u2013 Banyuwangi Paket II pada Juli lalu. Jalan tol sepanjang 11,2 km ini akan menghubungkan Kraksaan-Paiton dengan waktu tempuh hanya 10-15 menit saja, yang sebelumnya bisa memakan waktu sekitar 30 menit melalui jalan nasional.\u00a0\" \/>\n<meta property=\"og:url\" content=\"https:\/\/hkinfrastruktur.com\/en\/jalan-tol-probolinggo-banyuwangi-paket-ii-rampung-dibangun\/\" \/>\n<meta property=\"og:site_name\" content=\"PT Hutama Karya Infrastruktur (HKI)\" \/>\n<meta property=\"article:published_time\" content=\"2025-09-19T07:00:12+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-10-08T07:23:54+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/10\/Utama_WhatsApp-Image-2025-10-03-at-14.29.26_ad53352c.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1280\" \/>\n\t<meta property=\"og:image:height\" content=\"936\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Carmelita Christiee\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Carmelita Christiee\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/jalan-tol-probolinggo-banyuwangi-paket-ii-rampung-dibangun\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/jalan-tol-probolinggo-banyuwangi-paket-ii-rampung-dibangun\\\/\"},\"author\":{\"name\":\"Carmelita Christiee\",\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/#\\\/schema\\\/person\\\/7bb72f00eeac526685b83e8c361be6dd\"},\"headline\":\"Jalan Tol Probolinggo-Banyuwangi Paket II Rampung Dibangun,\u00a0KSO HKI-Acset-NK\u00a0Hadirkan Konektivitas Baru di Jawa Timur\u00a0\",\"datePublished\":\"2025-09-19T07:00:12+00:00\",\"dateModified\":\"2025-10-08T07:23:54+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/jalan-tol-probolinggo-banyuwangi-paket-ii-rampung-dibangun\\\/\"},\"wordCount\":281,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/jalan-tol-probolinggo-banyuwangi-paket-ii-rampung-dibangun\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/hkinfrastruktur.com\\\/wp-content\\\/uploads\\\/2025\\\/10\\\/Utama_WhatsApp-Image-2025-10-03-at-14.29.26_ad53352c.jpg\",\"articleSection\":[\"Berita Perusahaan\",\"Siaran Pers\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/hkinfrastruktur.com\\\/jalan-tol-probolinggo-banyuwangi-paket-ii-rampung-dibangun\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/jalan-tol-probolinggo-banyuwangi-paket-ii-rampung-dibangun\\\/\",\"url\":\"https:\\\/\\\/hkinfrastruktur.com\\\/jalan-tol-probolinggo-banyuwangi-paket-ii-rampung-dibangun\\\/\",\"name\":\"Jalan Tol Probolinggo-Banyuwangi Paket II Rampung Dibangun,\u00a0KSO HKI-Acset-NK\u00a0Hadirkan Konektivitas Baru di Jawa Timur\u00a0 - PT Hutama Karya Infrastruktur (HKI)\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/jalan-tol-probolinggo-banyuwangi-paket-ii-rampung-dibangun\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/jalan-tol-probolinggo-banyuwangi-paket-ii-rampung-dibangun\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/hkinfrastruktur.com\\\/wp-content\\\/uploads\\\/2025\\\/10\\\/Utama_WhatsApp-Image-2025-10-03-at-14.29.26_ad53352c.jpg\",\"datePublished\":\"2025-09-19T07:00:12+00:00\",\"dateModified\":\"2025-10-08T07:23:54+00:00\",\"description\":\"Jawa Timur \u2013 Kerja sama operasi (KSO) PT Hutama Karya Infrastruktur (HKI) \u2013 PT Acset Indonusa Tbk (Acset) \u2013 PT Nindya Karya (NK) (KSO HKI-Acset-NK) telah menyelesaikan pembangunan Tol Probolinggo \u2013 Banyuwangi Paket II pada Juli lalu. Jalan tol sepanjang 11,2 km ini akan menghubungkan Kraksaan-Paiton dengan waktu tempuh hanya 10-15 menit saja, yang sebelumnya bisa memakan waktu sekitar 30 menit melalui jalan nasional.\u00a0\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/jalan-tol-probolinggo-banyuwangi-paket-ii-rampung-dibangun\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/hkinfrastruktur.com\\\/jalan-tol-probolinggo-banyuwangi-paket-ii-rampung-dibangun\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/jalan-tol-probolinggo-banyuwangi-paket-ii-rampung-dibangun\\\/#primaryimage\",\"url\":\"https:\\\/\\\/hkinfrastruktur.com\\\/wp-content\\\/uploads\\\/2025\\\/10\\\/Utama_WhatsApp-Image-2025-10-03-at-14.29.26_ad53352c.jpg\",\"contentUrl\":\"https:\\\/\\\/hkinfrastruktur.com\\\/wp-content\\\/uploads\\\/2025\\\/10\\\/Utama_WhatsApp-Image-2025-10-03-at-14.29.26_ad53352c.jpg\",\"width\":1280,\"height\":936},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/jalan-tol-probolinggo-banyuwangi-paket-ii-rampung-dibangun\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/hkinfrastruktur.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Jalan Tol Probolinggo-Banyuwangi Paket II Rampung Dibangun,\u00a0KSO HKI-Acset-NK\u00a0Hadirkan Konektivitas Baru di Jawa Timur\u00a0\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/#website\",\"url\":\"https:\\\/\\\/hkinfrastruktur.com\\\/\",\"name\":\"PT Hutama Karya Infrastruktur (HKI)\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/hkinfrastruktur.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/#organization\",\"name\":\"PT Hutama Karya Infrastruktur (HKI)\",\"url\":\"https:\\\/\\\/hkinfrastruktur.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/hkinfrastruktur.com\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/logo-hki-02.png\",\"contentUrl\":\"https:\\\/\\\/hkinfrastruktur.com\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/logo-hki-02.png\",\"width\":1200,\"height\":619,\"caption\":\"PT Hutama Karya Infrastruktur (HKI)\"},\"image\":{\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.instagram.com\\\/hkinfrastruktur\\\/\",\"https:\\\/\\\/www.youtube.com\\\/@hkinfrastruktur2682\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/hk-infrastruktur\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/hkinfrastruktur.com\\\/#\\\/schema\\\/person\\\/7bb72f00eeac526685b83e8c361be6dd\",\"name\":\"Carmelita Christiee\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f8adef3a7872c3d5cb32061e0bf0ab51fbcff10c0b0e822cdc9e950b031563f8?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f8adef3a7872c3d5cb32061e0bf0ab51fbcff10c0b0e822cdc9e950b031563f8?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f8adef3a7872c3d5cb32061e0bf0ab51fbcff10c0b0e822cdc9e950b031563f8?s=96&d=mm&r=g\",\"caption\":\"Carmelita Christiee\"},\"sameAs\":[\"https:\\\/\\\/hkinfrastruktur.com\\\/\"],\"url\":\"https:\\\/\\\/hkinfrastruktur.com\\\/en\\\/author\\\/carmelitachristiee\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Jalan Tol Probolinggo-Banyuwangi Paket II Rampung Dibangun,\u00a0KSO HKI-Acset-NK\u00a0Hadirkan Konektivitas Baru di Jawa Timur\u00a0 - PT Hutama Karya Infrastruktur (HKI)","description":"East Java \u2013 The joint operation (KSO) of PT Hutama Karya Infrastruktur (HKI), PT Acset Indonusa Tbk (Acset), and PT Nindya Karya (NK) has successfully completed the construction of the Probolinggo\u2013Banyuwangi Toll Road Section II in July. The 11.2-kilometer toll segment connects Kraksaan and Paiton, reducing travel time to just 10\u201315 minutes from the previous 30 minutes via the national road.\u00a0","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/hkinfrastruktur.com\/en\/jalan-tol-probolinggo-banyuwangi-paket-ii-rampung-dibangun\/","og_locale":"en_US","og_type":"article","og_title":"Jalan Tol Probolinggo-Banyuwangi Paket II Rampung Dibangun,\u00a0KSO HKI-Acset-NK\u00a0Hadirkan Konektivitas Baru di Jawa Timur\u00a0 - PT Hutama Karya Infrastruktur (HKI)","og_description":"Jawa Timur \u2013 Kerja sama operasi (KSO) PT Hutama Karya Infrastruktur (HKI) \u2013 PT Acset Indonusa Tbk (Acset) \u2013 PT Nindya Karya (NK) (KSO HKI-Acset-NK) telah menyelesaikan pembangunan Tol Probolinggo \u2013 Banyuwangi Paket II pada Juli lalu. Jalan tol sepanjang 11,2 km ini akan menghubungkan Kraksaan-Paiton dengan waktu tempuh hanya 10-15 menit saja, yang sebelumnya bisa memakan waktu sekitar 30 menit melalui jalan nasional.\u00a0","og_url":"https:\/\/hkinfrastruktur.com\/en\/jalan-tol-probolinggo-banyuwangi-paket-ii-rampung-dibangun\/","og_site_name":"PT Hutama Karya Infrastruktur (HKI)","article_published_time":"2025-09-19T07:00:12+00:00","article_modified_time":"2025-10-08T07:23:54+00:00","og_image":[{"width":1280,"height":936,"url":"https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/10\/Utama_WhatsApp-Image-2025-10-03-at-14.29.26_ad53352c.jpg","type":"image\/jpeg"}],"author":"Carmelita Christiee","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Carmelita Christiee","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/hkinfrastruktur.com\/jalan-tol-probolinggo-banyuwangi-paket-ii-rampung-dibangun\/#article","isPartOf":{"@id":"https:\/\/hkinfrastruktur.com\/jalan-tol-probolinggo-banyuwangi-paket-ii-rampung-dibangun\/"},"author":{"name":"Carmelita Christiee","@id":"https:\/\/hkinfrastruktur.com\/#\/schema\/person\/7bb72f00eeac526685b83e8c361be6dd"},"headline":"Jalan Tol Probolinggo-Banyuwangi Paket II Rampung Dibangun,\u00a0KSO HKI-Acset-NK\u00a0Hadirkan Konektivitas Baru di Jawa Timur\u00a0","datePublished":"2025-09-19T07:00:12+00:00","dateModified":"2025-10-08T07:23:54+00:00","mainEntityOfPage":{"@id":"https:\/\/hkinfrastruktur.com\/jalan-tol-probolinggo-banyuwangi-paket-ii-rampung-dibangun\/"},"wordCount":281,"commentCount":0,"publisher":{"@id":"https:\/\/hkinfrastruktur.com\/#organization"},"image":{"@id":"https:\/\/hkinfrastruktur.com\/jalan-tol-probolinggo-banyuwangi-paket-ii-rampung-dibangun\/#primaryimage"},"thumbnailUrl":"https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/10\/Utama_WhatsApp-Image-2025-10-03-at-14.29.26_ad53352c.jpg","articleSection":["Berita Perusahaan","Siaran Pers"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/hkinfrastruktur.com\/jalan-tol-probolinggo-banyuwangi-paket-ii-rampung-dibangun\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/hkinfrastruktur.com\/jalan-tol-probolinggo-banyuwangi-paket-ii-rampung-dibangun\/","url":"https:\/\/hkinfrastruktur.com\/jalan-tol-probolinggo-banyuwangi-paket-ii-rampung-dibangun\/","name":"Jalan Tol Probolinggo-Banyuwangi Paket II Rampung Dibangun,\u00a0KSO HKI-Acset-NK\u00a0Hadirkan Konektivitas Baru di Jawa Timur\u00a0 - PT Hutama Karya Infrastruktur (HKI)","isPartOf":{"@id":"https:\/\/hkinfrastruktur.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/hkinfrastruktur.com\/jalan-tol-probolinggo-banyuwangi-paket-ii-rampung-dibangun\/#primaryimage"},"image":{"@id":"https:\/\/hkinfrastruktur.com\/jalan-tol-probolinggo-banyuwangi-paket-ii-rampung-dibangun\/#primaryimage"},"thumbnailUrl":"https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/10\/Utama_WhatsApp-Image-2025-10-03-at-14.29.26_ad53352c.jpg","datePublished":"2025-09-19T07:00:12+00:00","dateModified":"2025-10-08T07:23:54+00:00","description":"East Java \u2013 The joint operation (KSO) of PT Hutama Karya Infrastruktur (HKI), PT Acset Indonusa Tbk (Acset), and PT Nindya Karya (NK) has successfully completed the construction of the Probolinggo\u2013Banyuwangi Toll Road Section II in July. The 11.2-kilometer toll segment connects Kraksaan and Paiton, reducing travel time to just 10\u201315 minutes from the previous 30 minutes via the national road.\u00a0","breadcrumb":{"@id":"https:\/\/hkinfrastruktur.com\/jalan-tol-probolinggo-banyuwangi-paket-ii-rampung-dibangun\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/hkinfrastruktur.com\/jalan-tol-probolinggo-banyuwangi-paket-ii-rampung-dibangun\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/hkinfrastruktur.com\/jalan-tol-probolinggo-banyuwangi-paket-ii-rampung-dibangun\/#primaryimage","url":"https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/10\/Utama_WhatsApp-Image-2025-10-03-at-14.29.26_ad53352c.jpg","contentUrl":"https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2025\/10\/Utama_WhatsApp-Image-2025-10-03-at-14.29.26_ad53352c.jpg","width":1280,"height":936},{"@type":"BreadcrumbList","@id":"https:\/\/hkinfrastruktur.com\/jalan-tol-probolinggo-banyuwangi-paket-ii-rampung-dibangun\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/hkinfrastruktur.com\/"},{"@type":"ListItem","position":2,"name":"Jalan Tol Probolinggo-Banyuwangi Paket II Rampung Dibangun,\u00a0KSO HKI-Acset-NK\u00a0Hadirkan Konektivitas Baru di Jawa Timur\u00a0"}]},{"@type":"WebSite","@id":"https:\/\/hkinfrastruktur.com\/#website","url":"https:\/\/hkinfrastruktur.com\/","name":"PT Hutama Karya Infrastruktur (HKI)","description":"","publisher":{"@id":"https:\/\/hkinfrastruktur.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/hkinfrastruktur.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/hkinfrastruktur.com\/#organization","name":"PT Hutama Karya Infrastruktur (HKI)","url":"https:\/\/hkinfrastruktur.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/hkinfrastruktur.com\/#\/schema\/logo\/image\/","url":"https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2024\/10\/logo-hki-02.png","contentUrl":"https:\/\/hkinfrastruktur.com\/wp-content\/uploads\/2024\/10\/logo-hki-02.png","width":1200,"height":619,"caption":"PT Hutama Karya Infrastruktur (HKI)"},"image":{"@id":"https:\/\/hkinfrastruktur.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.instagram.com\/hkinfrastruktur\/","https:\/\/www.youtube.com\/@hkinfrastruktur2682","https:\/\/www.linkedin.com\/company\/hk-infrastruktur"]},{"@type":"Person","@id":"https:\/\/hkinfrastruktur.com\/#\/schema\/person\/7bb72f00eeac526685b83e8c361be6dd","name":"Carmelita Christiee","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/f8adef3a7872c3d5cb32061e0bf0ab51fbcff10c0b0e822cdc9e950b031563f8?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/f8adef3a7872c3d5cb32061e0bf0ab51fbcff10c0b0e822cdc9e950b031563f8?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/f8adef3a7872c3d5cb32061e0bf0ab51fbcff10c0b0e822cdc9e950b031563f8?s=96&d=mm&r=g","caption":"Carmelita Christiee"},"sameAs":["https:\/\/hkinfrastruktur.com\/"],"url":"https:\/\/hkinfrastruktur.com\/en\/author\/carmelitachristiee\/"}]}},"_links":{"self":[{"href":"https:\/\/hkinfrastruktur.com\/en\/wp-json\/wp\/v2\/posts\/7824","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hkinfrastruktur.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hkinfrastruktur.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hkinfrastruktur.com\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/hkinfrastruktur.com\/en\/wp-json\/wp\/v2\/comments?post=7824"}],"version-history":[{"count":1,"href":"https:\/\/hkinfrastruktur.com\/en\/wp-json\/wp\/v2\/posts\/7824\/revisions"}],"predecessor-version":[{"id":7829,"href":"https:\/\/hkinfrastruktur.com\/en\/wp-json\/wp\/v2\/posts\/7824\/revisions\/7829"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hkinfrastruktur.com\/en\/wp-json\/wp\/v2\/media\/7825"}],"wp:attachment":[{"href":"https:\/\/hkinfrastruktur.com\/en\/wp-json\/wp\/v2\/media?parent=7824"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hkinfrastruktur.com\/en\/wp-json\/wp\/v2\/categories?post=7824"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hkinfrastruktur.com\/en\/wp-json\/wp\/v2\/tags?post=7824"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}