The Palembang-Indralaya Toll Road is the first toll road constructed in South Sumatra Province.
- Built largely on swampy and waterlogged land
- The first use of the Vacuum Consolidation Method (VCM) soil improvement technique on a toll road in Indonesia, accelerating the release of water and air from the soil
- Pile slab construction implemented to maintain flood elevation in the area
The project involved working on soil with high moisture content and waterlogged areas. The application of VCM technology accelerated the removal of water and air within the soil, speeding up consolidation and improving soil bearing capacity. In waterlogged zones, HKI applied pile slab construction to maintain flood elevation across the site.
Project Data
Information
Details
Project Type
Roads & Bridges
Project Status
Completed Projects
Main Road Length
22 km
Project Duration
2015
- 2018
Project Value
IDR 3,12 Trillion
Location
South Sumatra