This toll road is the first toll road constructed in Bengkulu Province.

  • The alignment crosses mountainous and hilly terrains, presenting complex construction challenges.
  • Located in a high seismic risk zone.
  • Passes through geological formations such as marl and young coal, which required specific handling.
  • Crosses winding rivers, requiring modifications to several pier locations and the construction of pile slab bridges.

The construction of the Taba Penanjung–Bengkulu Toll Road posed significant challenges due to its route through mountainous and hilly areas with deep valleys and ravines, in addition to being situated in a high seismic zone. The project also required adjustments in pier placement due to the winding river paths. From a geological perspective, the toll road traversed formations containing marl, young coal, and other rock types that demanded tailored engineering approaches.

Pada Tol Taba Penanjung-Bengkulu, dibangun jembatan, pile slab serta struktur penunjang lainnya untuk menyeberangi lembah atau sungai, sehingga di sepanjang tol tampak potongan bukit yang membentuk kemiringan lereng dengan ketinggian yang bervariasi, salah satunya mencapai 45 meter.

Project Data

Information
Details

Project Type

Roads & Bridges

Project Status

Completed Projects

Main Road Length

17.6 km

Project Duration

2019

- 2022

Project Value

IDR 3,1 Trillion

Location

Bengkulu

Other Projects

  • Penanganan Mendesak Bencana – Malalak

    Construction

    •

    Other Infrastructure

  • Penanganan Mendesak Bencana – Lembah Anai

    Construction

    •

    Other Infrastructure

  • Palembang – Betung Toll Road Structure

    Construction

    •

    Roads & Bridges

  • Palembang - Betung Toll Road Section III

    Construction

    •

    Roads & Bridges