Padang – PT Hutama Karya Infrastruktur (HKI) has completed the construction of two rest and service areas (TIP), on the Padang-Sicincin Toll Road as of late June. The food court buildings at these rest areas on the 36.6-kilometer toll road section are designed adopting Minangkabau traditional house architecture.
Palembang – PT Hutama Karya Infrastruktur (HKI) continues the construction of the Trans Sumatra Toll Road (JTTS), including the 10.24-kilometer Palembang–Betung Structure segment and a rest area located along the Palembang–Betung Toll Road. As of the end of June 2025, the construction progress has reached 52%.
Pekanbaru – On Wednesday (25/6) to Thursday (26/6), HKI held a Sharing Session and Focus Group Discussion (FGD) on the implementation of construction quality for Construction Managers (CMs) and Site Operation Managers (SOMs) of HKI projects at the Pekanbaru Ring Road Project site.
Jakarta – PT Hutama Karya Infrastruktur (HKI) conducted a visit and distributed donations to the Tresna Werdha Budi Mulia 1 Elderly Care Center in Cipayung, East Jakarta, on Friday (20/6). This activity was part of HKI’s Corporate Social and Environmental Responsibility (CSR/TJSL) program and involved over a dozen employee representatives.
PT Hutama Karya Infrastruktur (HKI), a subsidiary of PT Hutama Karya (Persero), distributed sacrificial animals as a form of social care and contribution to the surrounding communities in commemoration of Eid al-Adha 1446 H.
East Java – On June 3 - 5, 2025, the Board of Commissioners of Hutama Karya conducted a working visit to the PT Bhirawa Steel (BS) plant in Surabaya, the Batching Plant Project of PT Semen Indogreen Sentosa (SIS), and the Probolinggo–Banyuwangi Toll Road Package II Project, developed by the HK Group.
Padang – PT Hutama Karya Infrastruktur (HKI) is accelerating the construction of a rest area, also known as Service and Rest Area (TIP), on the Trans-Sumatra Toll Road (JTTS), specifically along the Padang–Sicincin section. As of April 2025, the project’s physical progress has reached 80.06%.
Riau – PT Hutama Karya Infrastruktur (HKI), a subsidiary of PT Hutama Karya (Persero), has recorded significant progress in the construction of the Pekanbaru Ring Road Toll, which is part of the Rengat–Pekanbaru section of the Trans-Sumatra Toll Road (JTTS) network, with the project now reaching 50% physical completion of its total 30-kilometer length.
North Sumatra – The Binjai–Pangkalan Brandan Toll Road is now officially fully connected, reducing travel time by up to 40 minutes. It features rest areas with local cultural themes and is ready to support community mobility in North Sumatra ahead of the 2024 Christmas and 2025 New Year holidays.


