Jakarta – As the year draws to a close, PT Hutama Karya Infrastruktur (HKI) has completed several sections of the Trans Sumatera Toll Road (JTTS). As of the third quarter of 2022, HKI has finished the construction of the Binjai-Stabat Toll Road (12 km), Bengkulu-Taba Penanjung Toll Road (17 km), and Pekanbaru-Bangkinang Toll Road (31 km).
Jakarta – PT Hutama Karya Infrastruktur (HKI) has successfully implemented Building Information Modeling (BIM) in accordance with international standards. This achievement is demonstrated by the receipt of the ISO 19650 BIM certificate, which was officially awarded to HKI on Wednesday (5/10).
In celebration of the 77th Indonesian Independence Day, PT Hutama Karya Infrastruktur (HKI) and its subsidiaries brought goodwill to the surrounding communities through various Corporate Social Responsibility (CSR) programs across several locations in Java.
In celebration of Iduladha 1443 Hijriah, and as a form of concern for surrounding communities, HKI distributed sacrificial animals to communities around the company’s headquarters and projects. This initiative is expected to spread joy and strengthen relationships with the surrounding communities, particularly in the areas near the Trans Sumatra Toll Road construction project.
Pekanbaru – PT Hutama Karya Infrastruktur (HKI) has completed part of the Pekanbaru-Bangkinang Toll Road, one of the sections in the Trans Sumatra Toll Road (JTTS) Pekanbaru-Padang segment. HKI has successfully finished 31 km of the total 40 km of the toll road.
Jakarta – In line with the company's Long-Term Plan (RJPP), PT Hutama Karya Infrastruktur (HKI), a subsidiary of PT Hutama Karya (Persero), continues to adopt the latest technology in its work, including field operations. HKI is now using the photogrammetry method to assist in field surveys and monitor the physical progress of construction.
Bengkulu – The topography of the Bengkulu-Taba Penanjung Toll Road presents significant challenges, requiring the team to ‘cut through hills’ and build bridges – pile slabs to cross valleys and rivers. As a result, hillside cuts along the toll road form slopes with varying heights, the highest reaching approximately 45 meters. To prevent landslides, the slopes are constructed using a terraced system, with each terrace having a height of approximately 5 meters. Additionally, vegetation is planted to prevent erosion from rainfall.
Jakarta – On March 25, 2022, PT Hutama Karya Infrastructure (HKI) celebrated its 7th anniversary. As a subsidiary of the state-owned infrastructure company PT Hutama Karya (Persero) (Hutama Karya), HKI has contributed to the advancement of Indonesia’s infrastructure. Since 2015, HKI has been involved in constructing toll roads in Java and the Trans Sumatra Toll Road (JTTS).
North Sumatra – Safety and health at work (K3) have always been a priority for HKI in the construction of the Trans Sumatra Toll Road (JTTS), including the Binjai-Stabat Toll Road. The commitment to K3 in this project is evidenced by the Zero Accident Award presented by the Department of Manpower and Transmigration (Disnakertrans) of North Sumatra.


